Gas Processing Projects
Project Description
Propak provided Front End Engineering Design (FEED), detailed engineering and design, procurement and fabrication services to build a 30,000 bbl/d Deethanizer Unit. Propak’s stacked design, modularization strategy, and ability to trial-fit large modules in a shop environment minimized field construction time, improving overall project cost and schedule. Fireproofing of modules and equipment was completed in fabrication shop. Electrical end devices were wired to panels local to each module reducing field terminations and cable pulls.
Project Specs
-
Services Provided